Ask what a test establishes and which question remains unanswered. The report should connect each finding to its location, limits and next decision.
30-second start
What test information are you trying to understand?
Read the options and next steps
- An infrared moisture scan
Ask how the temperature patterns shown in the scan were checked and what the method can establish. The image does not by itself identify where water entered.
Explore this next step - An adhesion result
Keep the tested bond separate from questions about underlying materials. The example shows why those findings need separate explanations.
Explore this next step - A report with several findings
Connect each finding to its question, location, verification and limit. Then ask how it affects the recommendation.
Explore this next step
Read the evidence in this order
Question
What is the investigation intended to establish?
Finding
What was observed or measured, where and under what conditions?
Meaning and limit
What does it support, what remains uncertain and what happens next?
Different methods answer different questions
Visual inspection
Can add: a record of accessible surface conditions, details and visible damage.
Still ask: which areas or concealed layers were not assessed?
Infrared moisture survey
Can add: images of temperature differences that, under suitable conditions and with verification, help locate potentially wet insulation.
Still ask: how were indications checked, and what limits arose from the assembly or survey conditions?
Adhesion test
Can add: evidence about the tested bond using the reported surface, preparation, materials and method.
Still ask: what does this establish about other locations or the layers beneath the tested surface?
Exploratory opening or sample
Can add: direct information about materials and conditions at that opening or sample.
Still ask: how representative is the location, how does it relate to other findings and who restores the opening?
The investigator chooses methods suited to the question and roof. An owner does not need to select instruments or perform tests to ask for a clear explanation of the findings.
A thermal indication is not a leak-entry map
ASTM C1153 describes a practice for locating wet insulation using infrared imaging in defined roof configurations. Its public scope includes verification and makes clear that the practice does not establish the cause or point of moisture entry, or suitability of the waterproofing.
Ask the investigator to distinguish an indication, its verification and the conclusion. Conditions and construction can affect interpretation; a colored image without that explanation leaves the decision incomplete.
Put two findings beside two separate questions
Illustrative example
An adhesion result and an unresolved scan indication
Finding A
The report records a satisfactory adhesion result at one prepared test location.
Supports: the reported bond result at that location and under those test conditions.
Finding B
The survey marks an area for follow-up; the supplied report does not include verification.
Next question: how will the indication be checked, and could the result change what materials remain?
Conclusion: the adhesion result does not answer the concealed-condition question. Request the remaining evidence before treating the full recommendation as settled.
Ask for a report that connects the findings
- Purpose and scope: the question, roof sections and methods used.
- Location: a roof plan or photo references connecting findings to the building.
- Conditions and limits: access, construction, weather or other factors affecting the investigation.
- Verification: what was checked directly, what remains an indication and what was not investigated.
- Decision: how the findings support the recommendation and which answer could change it.
Before a test that opens the roof
Agree on the scope, authorization, coordination and responsibility for restoring the opening. Ask whether warranty notification or approval applies, and keep the findings and completed-restoration record together. Leave the testing and roof access to qualified professionals.
There is no universal test bundle for every project. For example, IIBEC’s roof-functionality advisory discusses multiple methods in the context of damage assessment; that does not mean every method is required for routine maintenance or coating evaluation.
Annotate one test finding
Use this optional checklist in your own notes. Leave unknown details open and add them as you learn more. Nothing is sent from this checklist.
Get AI help with this step
Our chatbot can help you work through this step. Click the green Ask Me Anything button in the corner to get started. Feel free to use our suggested prompts below.
Prefer to talk? Call Alex, our AI assistant, at 888-733-5583. You can ask Alex to text you a summary and the links you discussed.
- Question being investigated.
- Method, report date and location reference.
- What the report actually establishes.
- What remains unknown or requires verification.
- How that uncertainty could affect the proposed work.
- Next answer, responsible person and record of any opening’s restoration.
Take the next step
Continue with prepare for the inspection, review coating suitability, read why adhesion is only one question.
We help owners connect with independent roofing contractors.
Call 800-670-5583 Call Alex (AI): 888-733-5583
You can contact us before completing any notes.
Sources behind this guide
- ASTM C1153-23: public scope and significance — the intended application and limits of infrared wet-insulation location; this guide does not reproduce or replace the standard.
- IIBEC: Your First Step to Coating Success — surface bond and the condition of underlying materials.
- IIBEC Technical Advisory 025-2025 — investigation methods in the specific context of roof damage and functionality.